Week 1 – Building project WilTec: Earthworks
The first week on the construction site is finished.
The company Schlun has moved a lot of soil. Material arrived and left each 5 minutes with more than 200 construction vehicles in the last 3 days. The weather was very fine, so that we can perfectly maintain the building schedule.